GE N60 Instruction Manual page 129

Network stability and synchrophasor measurement system
Hide thumbs Also See for N60:
Table of Contents

Advertisement

CHAPTER 4: INTERFACES
To set up and use the label removal tool:
1.
Bend the tabs at the left end of the tool upwards as shown.
Bend the tab at the center of the tool tail as shown.
To remove the LED labels from the N60 enhanced front panel and insert the custom labels:
1.
Use the knife to lift the LED label and slide the label tool underneath. Ensure that the bent tabs are pointing away from
the relay.
N60 NETWORK STABILITY AND SYNCHROPHASOR MEASUREMENT SYSTEM – INSTRUCTION MANUAL
FRONT PANEL INTERFACE
4-25
4

Advertisement

Table of Contents
loading

Table of Contents