General
The validation procedures described in this chapter do not claim to be complete. The cor-
rect execution and compliance with all given system limitations and interface descriptions
as well as with standards and norms given by authorities must be proven by the aircraft
manufacturer.
Check starting
• Check of starting at cold weather condition. Starter interface must be executed.
Effectivity: 915 i A Series
Edition 0/Rev. 0
BRP-Rotax
INSTALLATION MANUAL

VALIDATION OF INSTALLATION

80–00–00