4.13 Lifting And Tie Down; Lifting; Tie Down - JLG 340AJ Operation And Safety Manual

Boom lift
Hide thumbs Also See for 340AJ:
Table of Contents

Advertisement

4.13 LIFTING AND TIE DOWN

(See Figure 4-6.)

Lifting

1. Refer to the Serial Number Plate, refer to the Specifications
section of this manual, or weigh the individual unit to find
out the Gross Vehicle Weight.
2. Place the boom in the stowed position.
3. Remove all loose items from the machine.
4. Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.
3121258

Tie Down

WHEN TRANSPORTING THE MACHINE IN THE STOWED POSITION, THE BOOM MUST BE
FULLY LOWERED INTO THE BOOM REST.
1. Place the boom in the stowed position or storage position.
2. Remove all loose items from the machine.
3. Secure the chassis and the platform using straps or chains of
adequate strength.