Shutdown Procedure; Fuel Reserve / Shut-Off System; Engines Only) - JLG 340AJ Operation And Safety Manual

Boom lift
Hide thumbs Also See for 340AJ:
Table of Contents

Advertisement

2. After engine has had sufficient time to warm up, shut engine
off.
3. Turn SELECT switch to PLATFORM.
4. From Platform, pull POWER/EMERGENCY STOP switch out,
then push the ENGINE START switch until engine starts.
NOTE:
Footswitch must be in released (up) position before starter will
operate. If starter operates with footswitch in the depressed posi-
tion, DO NOT OPERATE MACHINE.

Shutdown Procedure

IF AN ENGINE MALFUNCTION CAUSES AN UNSCHEDULED SHUTDOWN, DETERMINE
THE CAUSE AND CORRECT IT BEFORE RESTARTING THE ENGINE.
1. Remove all load and allow engine to operate at low speed
for 3-5 minutes; this allows further reduction of internal
engine temperature.
2. Push POWER/EMERGENCY STOP switch in.
3. Turn Platform/Ground Select switch to Off.
Refer to Engine Manufacturer's manual for detailed information.
3121258
Fuel Reserve / Shut-Off System (Gas or Diesel Engines
Only)
The Fuel Shutoff System senses when the fuel level is getting low
and automatically shuts the engine down before the fuel tank is
emptied.
Depending upon machine setup, the machine will either keep
the engine shut down until the fuel tank is refilled or the operator
will be able to restart and run the engine for an additional min-
ute. After 1 minute, the engine will shut off for a second time and
the machine will return to the engine shutdown mode until the
fuel tank is refilled.
– JLG Lift –
SECTION 4 - MACHINE OPERATION
4-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents