Setup > Static Switch - Gamatronic CENTRIC 50 kW User Manual

Ups system
Hide thumbs Also See for CENTRIC 50 kW:
Table of Contents

Advertisement

7.2.4
Setup > STATIC SWITCH
7.2.4.1
SETUP > ST.SW. > CALIBRATE BYPASS VOLTAGE
For calibration of the bypass voltage reading, by phase.
7.2.4.2
SETUP > ST.SW. > CALIBRATE INVERTER VOLTAGE
For calibration of the inverter voltage reading, by phase.
7.2.4.3
SETUP > ST.SW. > CALIBRATE OUTPUT VOLTAGE
For calibration of the ac output voltage reading, by phase.
7.2.4.4
SETUP > ST.SW. > CALIBRATE OUTPUT CURRENT
For calibration of the ac output current reading, by phase.
Note:
Static switch output current calibration should be performed only if necessary, not casually.
Static switch output current calibration should be performed only under conditions where the
system input and output current are stable and not subject to fluctuation.
Calibration is best performed when the system is under relatively high load (70+ %).
34
G
E
AMATRONIC
LECTRONIC
Figure 22: "Setup > Static Switch" options
I
L
.
NDUSTRIES
TD
CENTRIC User Guide, rel. 3.4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents