Preparatory Steps Prior To Installation - Endress+Hauser Proline Prosonic Flow 93T Portable Operating Instructions Manual

Portable ultrasonic flow measuring system
Hide thumbs Also See for Proline Prosonic Flow 93T Portable:
Table of Contents

Advertisement

Installation
2.2

Preparatory steps prior to installation

Depending on the conditions specific to the measuring point (e.g. Clamp On, number of
traverses, fluid, etc.), a number of preparatory steps have to be taken before actually installing
the sensors:
1.
Using the conditions specific to the measuring point, determine which installation
distances are necessary for installation.
2.
Determine the values for the requisite installation distances.
3.
Mechanical preparation of the Clamp On holders for the sensors:
– Mount the sensor holder (DN 15 to 65 / ½ to 2½")
– Premount the strapping bands (DN 50 to 200 / 2 to 8") or
(DN 250 to 4000 / 10 to 160")
2.3
Determining the necessary installation distances
The installation distances that are necessary for installation depend on:
• The type of sensor: Prosonic Flow P DN 50 to 4000 (2 to 160") or DN 15 to 65 (½ to 2½")
• Number of traverses
DN 50 to 4000 (2 to 160")
1 traverse
SENSOR DISTANCE
WIRE LENGTH
* In the SENSOR DISTANCE function, the distance is indicated in millimeters. The POSITION SENSOR function displays
the values for using the mounting rail (e.g. A3).
2.4
Connecting and switching on the transmitter
Fig. 3: Connecting and switching on the transmitter
On/off switch (press switch ≥ 3 seconds)
1
2
Charger connection (different adapters are available for the connection)
8
2 traverses
SENSOR DISTANCE
POSITION SENSOR
1
12V DC
2
DN 15 to 65 (½ to 2½")
1 traverse
mA IN
mA OUT
DATA
SERVICE
CH-UP
CH-DN
Proline Prosonic Flow 93T Portable
2 traverses
SENSOR DISTANCE*
POSITION SENSOR*
Endress+Hauser
A0011547

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents