Inlet and outlet runs
If possible, install the sensor well clear of fittings such as valves, T-pieces, elbows, etc. If several
flow obstructions are installed, the longest inlet or outlet run must be considered. Compliance
with the following inlet and outlet runs is recommended in order to ensure measuring accuracy.
Fig. 3: Ein- und Auslaufstrecken (Draufsicht)
1
Valve (2/3 open)
2
Pump
3
Two pipe bends in different directions
2.2

Preparatory steps prior to installation

Depending on the conditions specific to the measuring point (e.g. Clamp On, number of
traverses, fluid etc.), a number of preparatory steps have to be taken before actually installing the
sensors:
1.
Using the conditions specific to the measuring point, determine which installation
distances are necessary for installation.
2.
Determine the values for the requisite installation distances.
A number of methods are available for determining the values:
– FieldCare (operating program) procedure explained in the Operating Instructions on
– Local operation of the device
– Applicator (software) procedure explained in the Operating Instructions on the
the CD-ROM
CD-ROM
– Premount the strapping bands (DN 50 to 200 / 2 to 8") or 
3.
Mechanical preparation of the "Clamp On" holders for the sensors:
(DN 250 to 4000 / 10 to 160")
Endress+Hauser
³ 15 x DN
³ 20 x DN
1
³ 20 x DN
2
³ 15 x DN
3
³ 3 x DN
Installation
A0013079
7