Dell PowerEdge FX2 Deployment Manual page 40

Configuring, testing and validating vlt on a pair of fn410s i/o modules in a poweredge fx2 chassis (v2.2)
Hide thumbs Also See for PowerEdge FX2:
Table of Contents

Advertisement

FC630 Server
The steps necessary to configure the VLT links are shown in Figure 36.
PowerEdge FX2 – FN I/O Module – VLT Deployment Guide | Version 2.2
40
VLT Domain
FN410S-A1
FN410S-A2
S4810 member and peer link (ICL) configuration
S4810-1
Configure the VLT links including the
ICL/peer link on the S4810
Configure the peer link
interface port-channel 55
description "VLTi Link to
4810-2"
channel-member fortyGigE
0/56,60
no shutdown
exit
interface range
fo0/56,fo0/60
description "VLTi Peer-
Link"
no shutdown
exit
Configure the VLT domain
Set the peer link port channel of
Switch 2
Configure back-up destination
VLT Domain 2
S4810-1
Fo 0/56
Fo 0/60
VLTi (po 55)
Fo 0/56
Fo 0/60
S4810-2
S4810-2
Configure the VLT links
including the ICL/peer link on
the S4810
Configure the peer link
interface port-channel
55
description "VLTi Link
to 4810-1"
channel-member
fortyGigE 0/56,60
no shutdown
exit
interface range
fo0/56,fo0/60
description "VLTi
Peer-Link"
no shutdown
exit
Configure the VLT domain
Set the peer link port channel
of Switch 1
Configure back-up
destination management IP

Advertisement

Table of Contents
loading

This manual is also suitable for:

Poweredge fn410s

Table of Contents