Dell PowerEdge FX2 Deployment Manual page 37

Configuring, testing and validating vlt on a pair of fn410s i/o modules in a poweredge fx2 chassis (v2.2)
Hide thumbs Also See for PowerEdge FX2:
Table of Contents

Advertisement

Next, another port channel is created for the FC630 blade server to communicate. A corresponding
VLT peer lag is assigned to the peer switch. Internal port Te0/1 is added to the port channel and LACP
is enabled with the mode active command.
FC630 Server
VLT LAG to teamed NIC interfaces (#1) and VLT LAG to mVLT S4810 connection (#2)
A final port channel is created for upstream communication to the pair of S4810 switches. The VLT
peer-lag is set to the same port channel ID. External interfaces 11 and 12 are added to this port
channel and LACP is enabled with the mode active command.
Figure 34 contains the steps necessary to configure the peer LAG and the upstream links for the
mVLT connection.
PowerEdge FX2 – FN I/O Module – VLT Deployment Guide | Version 2.2
37
VLT Domain
FN410S-A1
Te 0/1
Te 0/9
Te 0/10
VLTi (Po 127)
Te 0/9
Te 0/10
FN410S-A2
Te 0/1
VLT Domain 2
Te 0/11
Te 0/12
Te 0/11
Te 0/12
S4810-A1
S4810-A2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Poweredge fn410s

Table of Contents