Chapter 2 - Hardware Installation

MGC-100 Hardware Installation

Unpacking and Positioning the MGC-100

2-2
To unpack and position the MGC-100:
1.
When you receive your MGC-100, inspect the equipment for damage
and verify that the components match the packing slip. If you did not
receive a component or if there is damage to the system, notify your
service representative immediately.
Wood Packing Case
Lock in Closed Position
Lock in Open Position
Figure 2-1: MGC-100 package
2.
Place the MGC-100 unit on a stable flat surface in a location that meets
the MGC environment requirements, which are:
Operating temperature: 10°–40°C (50°–104°F)
Humidity: 15%–90% non-condensing
Altitude: Up to 3,000m (10,000ft)
ESD: +8 kV
Carrying Strap

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DOC2237A and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Mgc 50Mgc 100

Table of Contents