4.7 Switch membrane
Installing the switch membrane
The following describes the procedure for installing the switch membrane (See Figure 4-12).
1. Connect the switch membrane to the connector PJ9650 on the system board.
2. Slide to install the switch membrane an secure it with the following screw.
•
NOTE: After connecting the switch membrane, put the switch membrane into the slit of
the display assembly.
3. Install the LCD Con holder and secure it with the following screw.
•
NOTE: When installing the LCD CON holder, be careful not to catch the harness and
cable.
QOSMIO E10 Maintenance Manual (960-492)
M2.5×2.8B
FLAT BIND screw
M2.5×6B FLAT BIND screw
4 Replacement Procedures
x1
x1
4-25