Configuring/parameterizing
6.4 Configuring devices
5. Click Next. Run through all the other dialogs without change until the final Summary dialog.
6. Click Finish.
Thus, the configuration is finished.
6.4.4.7

Testing the drive with the drive control panel

Drive control panel
The drive control panel is used to control and monitor individual drives. With the drive control
panel, you can traverse drives and can:
● Test each part of the system individually before the drives are traversed in a coordinated
manner by means of a program.
● Test in a fault situation whether the individual drives can be traversed by the drive control
panel at all, or whether there are already problems here.
This software may be used only when the associated safety instructions are observed! The
non-observance can cause injury to persons or damage to material!
The function is released exclusively for commissioning, diagnostic and service purposes. The
function should generally only be used by authorized technicians. The safety shutdowns from
the higher-level control have no effect.
The Stop with preconfigured braking ramp function is not guaranteed in all operating states.
Therefore, there must be an EMERGENCY STOP circuit in the hardware. The appropriate
measures must be taken by the user.
Requirements
● You have created and fully configured a drive in the project.
● You have stored and compiled the project. The project is consistent.
● SIMOTION SCOUT is in online mode.
● The project with the drive parameterization has been loaded to the target system.