Installing On The Control Panel In The Boiler; Installing The Covers And Power Plug - Windhager logwin premium touch Installation Instructions Manual

Wood gasification boiler
Hide thumbs Also See for logwin premium touch:
Table of Contents

Advertisement

3.
For the electrician

3.2.2 Installing on the control panel in the boiler

– Loosen the screws at the top of the cover for the function module and lift up the cover.
– Screw the function module onto the control panel with the U-washers and self-tapping screws supplied – Fig. 93.
– Establish all electrical connections in line with Section 4.10 and the instructions supplied for the relevant function
modules. Route the cables into the bottom of the function module housing and fasten with cable ties as strain relief.
– Attach the cover and fasten it at the bottom with the screws.
Fig. 93
Installing the MES INFINITY control system (function modules) on the control panel
3.3

Installing the covers and power plug

– Hook in the front boiler cover (Fig. 94) and secure with 2 screws – Fig. 95.
Fig. 94
Hooking in the boiler cover
– Put on the rear boiler cover – Fig. 96.
– Connect or plug in the power plug at the rear of the boiler – Fig. 97.
Fig. 96
Putting on the rear boiler cover
Fig. 95
Securing boiler cover in 2 places
Fig. 97
Inserting or connecting the
power plug
40
2 x
Power plug

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents