2.
Operation

2.1.1 Control panel

InfoWIN Touch
See operating manual InfoWN Touch.
LED stripe
The LED stripe shows the charge status of the accumulator from blue (cold) to hot (red).
LED stripe
Fig. 4
LogWIN Premium Touch control panel
2.2

Check before first heating

a) System pressure (heating water pressure): The system must be filled and vented. With the system cold, pressure
should be at least 1.0 bar (maximum 1.8 bar). If you have any questions, your installer will gladly answer them.
b) Ventilation: Please make sure the boiler room/installation room is well ventilated. The air supply must be as free
of dust as possible.
c) Flue: Please have the chimney sweep check the flue regularly, and, if necessary, clean it.
d) Barriers: Check that the barriers installed in the heating system are set correctly.
e) Buffer tank: If the charge status (see InfoWIN Touch operating manual) is already 70 %, do not start or replenish
the fuel.
f) Thermal discharge safeguard: Check discharge funnel. Outflow must not drip.
2.3
Heating mode – preparing, starting or replenishing
fuel
DANGER
If the outside temperature is high of the flue is in direct sunlight, flue gas may discharge
into the boiler room/installation room in the start phase due to a lack of flue draught.
The flue gas may cause serious intoxication or deflagration.
Tip: Set the start times in the cooler morning or evening times and, together with your
chimney sweep, ensure that the flue system is working correctly in line with the con-
ditions listed above.