Installing The Control Panel - Windhager LogWIN Klassik Assembly Instructions Manual

½ m wood gasification boiler; for small and large houses; nominal thermal output: 18, 25, 30 kw
Hide thumbs Also See for LogWIN Klassik:
Table of Contents

Advertisement

2.
For the Installer

2.4.11 Installing the control panel

– Place the control panel on the side panels and attach it to each with 2 self-tapping screws and 1 saw tooth ring
for earthing – Fig. 27.
– Attach the cable channels at left and right (feed-through at rear) with a drilling screw on each side to the front
of the control panel; leave some overhang over the cladding at the rear (approx. 5 mm) – Fig. 27. Cable routing,
see Fig. 33 and Item 3.
1 x
1 x
1 x
Fig. 27 Screw the control panel on loosely; screw the cable channels tight.
Feed-through
Cable channels
ls
17
1 x
1 x
1 x

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents