2.
For the installer
1 ........... Front set screws (2 pcs.)
2 ........... Blower seal
3 ........... Flue connection adapter – accessories
4 .......... Blower housing
5 ........... Flue gas blower
6 .......... Wing nuts
7 ........... Door handles (3 pcs.)
8 .......... Air control
9 .......... Lambda sensor
10 ........ Lighting door with automatic ignition – accessories
11 ......... M8x60 threaded rod (2 pcs.)
12 ......... Operating panel with carburisation gas duct
13 ......... Lower door hinge
14 ......... Lower left/right insulation
15 ......... Upper left/right insulation
16 ......... Upper insulation
17 ......... Left side panel
18 ......... Right side panel
19 ......... Cleaning cover

2.3.2 Taking into the building and installing

The appliance must be taken into the building and installed without subjecting it to significant knocks and jolts. in
order to avoid damaging the combustion chamber and the shifting of parts. All warranty claims will be invalidated if
the appliance is damaged due to having been taken into the building and installed incorrectly or if the appliance mal-
functions as a consequence of this.
The boiler may only be transported vertically and without its cladding. The easiest way to do this is with a lift truck or by
rolling on pipes. If transporting via stairs. etc.. the boiler should be secured appropriately. For installation dimensions.
refer to the technical data in Section 4.5 and Section 4.7.
Note!
There is a crane lug on the top of the LogWIN for transporting using winches. The weight can be reduced
by approx. 70–80 kg by removing parts which are easy to take off (e.g. doors. hook-in plates. burn through
plates. heating surface cleaning mechanism. etc.).
The boiler can be installed directly on a fire-resistant surface and does not require a special foundation.
2.3.3 Minimum clearances for fire protection. cleaning and
maintenance
The following minimum clearances from flammable materials and for connections. cleaning and maintenance must be
complied with.
DANGER
Minimum clearances between exhaust pipe (piece connecting to flue) and combustible components
1
400
mm
for an uninsulated exhaust pipe
100
1
mm
for an insulated exhaust pipe (min. 2 cm insulation thickness)
2
50
mm
for tested. double-walled exhaust system
1
DIN V 18 160-1
2
in accordance with approval/identification of system flue
Follow the installation guidelines for boiler rooms! The configuration of the exhaust
line must comply with technical fire protection requirements in accordance with the
applicable regulations. standards and guidelines.
20 ........ Upper insulating plate
21 ......... Control panel
22 ......... Thermocontrol sensor cover
23 ......... Cable channel (2 pcs.)
24 ........ Upper rear insulation
25 ......... Lower rear insulation
26 ........ Upper rear panel
27 ......... Lower rear panel
28 ........ Grommet
29 ........ Lever for cleaning heating surfaces
30 ........ Cladding door
31 ......... Upper door hinge
32 ......... InfoWIN Touch
33 ......... Front operating panel insulation
34 ........ MES INFINITY control system function modules
35 ......... Front boiler cover
36 ........ Rear boiler cover
37 ......... Hanger
12