Sign In
Upload
Manuals
Brands
Windhager Manuals
Stove
BIOWIN 2 TOUCH
Windhager BIOWIN 2 TOUCH Manuals
Manuals and User Guides for Windhager BIOWIN 2 TOUCH. We have
4
Windhager BIOWIN 2 TOUCH manuals available for free PDF download: Operating Manual, Installation Instructions Manual
Windhager BIOWIN 2 TOUCH Operating Manual (72 pages)
PELLET BOILER
Brand:
Windhager
| Category:
Boiler
| Size: 8 MB
Table of Contents
Table of Contents
2
Important Information for System Operators
4
General Information
4
Relevant Documents
5
Safety Instructions and Other Symbols in this Documentation
6
Structure of Safety Instructions
6
Symbols, Type of Risk or Meaning
6
Keywords
6
Liability Exclusion
6
Safety
7
General Safety Information
7
Safety Instructions
7
General Statement on Working with and Using the Web Server
12
Operation
13
Infowin Touch Display and Operating Unit
13
Integrated Web Server in the Infowin Touch
14
Data Protection and Security
14
Passwords
14
Connection Via the Internet
14
Authorisations
14
Infowin Touch Menu Structure
15
Biowin 2 Touch Menu Structure for the System Operator
16
Function Module INF F05 W/S/K Menu Structure for the System Operator
17
Basic Operating Functions
18
Symbols for Operation/Navigation
18
How to Use the Infowin Touch
19
Confirmation, Cancel, Slider Button and Arrow Button
19
Confirming Selection Options
19
Editing a Value And/Or Selection
20
On-Screen Keyboard
20
Turning on for the First Time
21
Homescreen (Title Screen)
23
Infowin Touch or Master Control Touch Basic Settings
24
Language
25
Time/Date
25
Time Format
25
Date Format
25
Time Server
26
Time Zone
26
Time
26
Date
26
Sending Interval Time/Date
27
Temperature Format
27
Unit of Weight
27
Display Brightness
27
Homescreen
28
Boiler
28
Function Titles
28
Guided Start-Up
29
Lan
29
MB (Master Control)
30
Read Plant
30
Restart
30
Factory Settings
30
Device Information
31
Operation Modes
32
OFF Mode
32
ON Mode, Self-Test, Display off
33
Fuel Feed
34
Solid Fuel/ Buffer Mode
34
Chimney Sweep Function/Manual Operation
35
Chimney Sweep Function
35
Manual Mode
36
Shut-Down Procedure
36
Operating Phases
37
Information Level
38
Information Level of the Boiler
39
Operator Level
40
Operator Level of the Boiler
40
Fill Fuel Hopper
41
Confirming Cleaning or Main Cleaning - Resetting the Cleaning Request
41
Warning Level Storage Room
42
Feed System Operating Mode
43
Time Profile Feed System
44
Probe Switching
45
Heating Surface Cleaning
46
Fuel Feed System Request
47
Correction of Cleaning Interval
47
Operator Level of the Function Module INF F05 W/S/K
48
Pump Control
48
Ext. Heating Demand
50
Collective Alarm
50
Troubleshooting
51
No Display on Infowin Touch
52
Info Messages
52
Error Messages
53
Alarm Messages
56
For the Service Technician/Heating Technician
61
Menu Structure for Service Level and Actuator Test
61
Service Level
61
Service Level of Biowin 2 Touch
63
Values
63
Parameters
63
Fuel Quantity Auger Conveyor
63
Delivery Time Ignition Phase
64
Hysteresis Burner on
64
Maximum Value of Set Temperature
64
Set Temperature Ext. Heating Demand
64
Operating Time of Suction Turbine
64
Profile Ash Removal
65
Correction Ash Removal
65
Limits for Blower Speed
65
Full Service
65
Flue Gas Min. Temperature
66
Minimum Boiler Power Output
66
Lock Burner
66
Boiler Status
66
Start-Up
66
Auger Conveyor
66
Feed
66
Settings
67
Boiler No. (Heat Generator Number)
67
Type of Fuel Feed System
67
External Combustion Air Supply
67
Shut-Off Unit
67
Air Intake Flap
68
Full Service On/Off
68
Strike Mode
68
Ash Removal System (Only Biowin 2 Touch Exklusiv/Plus und Alpha)
68
Duowin Separate Chimneys (Only Duowin)
68
Actuator Test
69
The Following Actuators Can be Started with the Biowin 2 Touch
69
The Following Actuators Can be Started with the Function Module INF F05 W/S/K
70
Starting up the Integrated Web Server
70
Internet Connection and Router Configuration
70
Start-Up
70
Reserved IP Address Ranges
70
Advertisement
Windhager BIOWIN 2 TOUCH Installation Instructions Manual (64 pages)
PELLET BOILER
Brand:
Windhager
| Category:
Stove
| Size: 19 MB
Table of Contents
Table of Contents
2
The Clean Air Act and Smoke Control Areas
4
Important Information
4
General Information
4
Relevant Documents
4
Safety Instructions and Other Symbols in this Documentation
4
Structure of Safety Instructions
4
Symbols, Type of Risk or Meaning
4
Keywords
5
Units of Measurement
5
Safety
6
General Safety Information
6
Technical Data and Product Fiche
6
Health and Safety
7
Carbon Monoxide (CO) Alarms
7
Access to Site
7
Handling of Appliance
7
Electrics
7
Working at Heights
7
Ventilation
7
Asbestos
8
Handling
8
Flue
8
Design
8
Grade / Specification
8
Draught Regulation
8
Chimney Cleaning
8
Technical Data for Calculating the Flue Gas System Acc. to en 13384-1
9
Boiler Room/Installation Room
9
Fuel Storage
10
Commissioning and Operation
11
Disposal/Recycling
11
For the Installer
12
Scope of Supply, Packaging
12
System
13
Area of Use
13
Standards
13
Heating Circuits
13
Circulation Pump
13
Buffer (Heat Accumulator)
13
Return Temperature
13
System Water
14
Water-Side Resistance (Pressure Loss)
14
Combustion Air
14
Combustion Air Supplied Directly from the Plant Room
15
External Combustion Air Supply
15
Installation Sequence
17
Parts Designations for Installation
17
Positioning, Preparing for Installation
18
Installation (Observe Minimum Clearances - Section 13.4)
20
Minimum Clearances for Fire Protection, Cleaning and Full Service
21
Biowin 2 Touch BWE 382-63
21
Biowin 2 Touch BWE 382-632 - Cascade
23
Installing the Drain Cock
24
Moving the Flue Connection to the Rear
25
Moving the External Combustion Air Supply
26
Installing the Boiler Pellet Hopper
27
Installing the Suction Turbine
30
Installing the Top Left Cladding
31
Putting the Boiler into the Final Installation Position and Aligning It Horizontally
32
Installing the Floor Plate
33
Installing the Rear Panel of the Fuel Hopper
34
Installing the Side Panel on the Right
35
Installing the Control Panel
36
Fitting the Cladding Door on the Right
37
Installing the Top Right Part of the Cladding
37
Installing the Side Panel on the Left
38
Installing the Door Mounting Bracket
39
Installing the Cladding Door on the Left
40
Installing the Top Left Part of the Cladding
41
Attaching the Insulation to the Auger Tube/Rotary Feeder
41
Installing the Anti-Contact Protection Plate at the Bottom
42
Installing the Cable Duct
42
Installing the Anti-Contact Protection Plate at the Top
43
Installing the Locking Plate
43
Installing the Infowin Touch
44
Installing the Feed and Return Air Hose
44
Rear Fuel Hopper Cladding Cover
45
Front Fuel Hopper Cladding Cover
46
Cladding Cover
46
Installing the Access Ramp and Ash Box
47
Cleaning and Operating Implements
48
Installing the Connecting Flue Pipe (Connecting Piece to the Flue)
49
For the Electrician
51
Cable Cross-Sections and Cable Lengths
51
Electrical Connections
52
Connecting the INFINITY TA Control
55
Installing Covers
56
For the Service Technician
57
Commissioning and Operating Instructions
57
Service and Repair Work
57
Dimensional Drawings
58
Electric Circuit Diagrams
59
Basic Circuitry - Biowin 2 Touch
59
Plan E1
59
Plan E2
60
Plan E3
61
Connection Diagram - Biowin 2 Touch
62
Connection Diagram for Pellet Feed with Buried Tank Mixer
63
Windhager BIOWIN 2 TOUCH Operating Manual (64 pages)
PELLET BOILER
Brand:
Windhager
| Category:
Boiler
| Size: 6 MB
Table of Contents
Table of Contents
2
Important Information for System Operators
4
General Information
4
Relevant Documents
5
Safety Instructions and Other Symbols in this Documentation
6
Structure of Safety Instructions
6
Symbols, Type of Risk or Meaning
6
Keywords
6
Liability Exclusion
6
Spare Parts
6
Data Plate
7
Safety
7
Manufacturer's Obligations
7
Installer's Obligations
7
Operator's Obligations
8
General Safety Information
8
Sources of Danger
9
Power Failure (or if the Induced Draught Fan Is Not Running)
9
Burner Bowl
9
Entering the Pellet Storage Room, Storage Container
9
Combustion Air
9
Fuel
10
Commissioning and Operation
11
Safety Device and Function Checks
11
Filling the Pellet Store (Bulk Fill)
12
Entering the Pellet Storage Room, Storage Container
13
Safety Instructions
13
Operation
19
Opening the Cladding Door
19
Functional Description, Components and Operating Controls Biowin 2 Touch
20
Biowin 2 Touch Klassik/Klassik-L
20
Biowin 2 Touch Exklusiv-S/Exklusiv-SL
21
Biowin 2 Touch Premium / Exklusiv
22
Functional Description Function Module INF F05
23
External Heating Demand (INF F05 W)
23
Heating Demand 0 - 10 V DC
23
Digital Potential-Free Extra-Low-Voltage Contacts (5 V DC)
23
Digital Low-Voltage Input (230 V AC)
23
Pump Control with Relay
23
Collective Alarm (INF F05 S)
24
Cascade Function (INF F05 K)
24
Pump Control with Speed Regulation
24
Buffer Loading Pump
25
Boiler Pump
25
Assigned to Boiler (Heat Generator)
25
General Functions
25
Boiler Start-Up Relief and Excess Temperature Protection Functions
25
Pumps Seizing
25
Set Point Offset
25
Check before Switching on
26
Filling the Boiler Pellet Hopper
26
Manual Filling, Biowin 2 Touch Klassik/Klassik-L/Exklusiv-S/Exklusiv-SL
26
Fully Automatic Filling, Biowin 2 Touch Premium/Exklusiv
26
Heating System Operation
26
Turning the Boiler on
27
Emergency Operation
27
Care, Cleaning and Full Service
28
Overview of Intervals between Cleaning (Full Service)
28
Confirming Cleaning or Main Cleaning - Resetting the Cleaning Request
29
Cleaning and Operating Implements
30
Care of Cladding and Infowin Touch
30
Emptying the Ash Pan and Removing Ash from below the Heat Exchanger
31
Emptying the Ash Box
33
Cleaning the Combustion Chamber and Burner Bowl
35
Cleaning the Thermocontrol Sensor and down Chute
36
Cleaning the Burner Bowl
37
Cleaning the Top Heat Exchangers and Induced Draught Fan Wheel
38
Exhaust Pipe to Flue
40
Disposal of Ashes
40
Creosote - Formation and Need for Removal
40
Water Tank Level
41
Cleaning the Boiler Pellet Hopper and Feed Unit Flap, and Re-Filling the Boiler Pellet Hopper in an Emergency
42
Clean the Boiler Pellet Hopper and the Feed Flap
43
Emergency Re-Fill of the Boiler Pellet Hopper
44
Storage Room or Storage Container
45
Full Service
46
Spare Parts
47
Biowin 2 Touch Pellet Boiler
47
Reserve Supply Container - Biowin 2 Touch
50
Reserve Supply Container with Suction Feed and Reserve Supply Container 236 Lb / 107 Kg - Without Suction Feed
50
Reserve Supply Container L 441 Lb / 200 Kg
51
Control Panel - Biowin 2 Touch
54
Burner - Biowin 2 Touch
56
Heating Surface Cleaning - Biowin 2 Touch
58
Ash Box - Biowin 2 Touch
59
Cladding - Biowin 2 Touch
60
3-Way Changeover Unit
61
Disposal/Recycling
63
Advertisement
Windhager BIOWIN 2 TOUCH Installation Instructions Manual (64 pages)
PELLET BOILER
Brand:
Windhager
| Category:
Boiler
| Size: 7 MB
Table of Contents
Table of Contents
2
Important Information
4
General Information
4
Relevant Documents
5
Safety Instructions and Other Symbols in this Documentation
5
Structure of Safety Instructions
5
Symbols, Type of Risk or Meaning
5
Keywords
6
Safety
6
General Safety Information
6
Liability Exclusion
7
Safety Instructions
7
Flue
12
Adjusting the Barometric Damper
12
Boiler Room/Installation Room
13
Fuel Storage
13
Initial Commissioning and Operating Instructions
14
Disposal/Recycling
14
For the Installer
15
Scope of Supply, Packaging
15
System
16
Area of Use
16
Standards
16
Return Temperature
16
Thermal Storage (Buffer Tank)
16
Operation by Control
17
System Water
17
Water-Side Resistance (Pressure Loss)
19
Combustion Air
19
Combustion Air Supply Directly from the Installation Room
19
External Combustion Air Supply
19
Installation Sequence
20
Parts Designations for Installation
20
Positioning and Installation
21
Removing the Crate
21
Taking the Boiler off the Installation Pallet and Transporting It to Where It Is to be Installed
22
Remove the Desiccant Bags
23
Installation (Observe Minimum Clearances - Section11.5)
24
Minimum Clearances for Fire Protection, Cleaning and Full Service
25
Installing the Drain Cock
26
Moving the Flue Connection to the Rear
27
Installing the Integral Fuel Hopper
29
Integral Fuel Hopper Cladding
35
Aligning the Boiler Horizontally
39
Cladding Door and Side Panel
40
Infowin Touch and Operating Panel
41
Cladding Cover and Insulation
42
Ash Box and Cover below the Integral Fuel Hopper
43
Installing the Feed and Return Air Hose (Biowin 2 Touch Premium/Exklusiv Only)
44
Cleaning and Operating Implements
45
Installing the Connecting Flue Pipe
46
For the Electrician
48
Electrical Connections
48
Connecting the Function Modules
49
Operating with External Control
49
Installing Covers
50
For the Service Technician
51
Commissioning and Operating Instructions
51
Service and Repair Work
51
Technical Data
52
Technical Data - Function Module INF F05 W/S/K
52
Technical Data for Calculating the Flue Gas System Acc. to en 13384-1
52
Technical Data - General
53
Dimensional Drawings
54
Electric Circuit Diagrams
56
Basic Circuitry - Biowin 2 Touch
56
Plan E1
56
Plan E2
57
Plan E3
58
Plan E4
59
Connection Diagram - Biowin 2 Touch
60
Connection Diagram for Pellet Feed with Buried Tank Mixer
61
Connection Diagram Function Module INF F05 W
62
Connection Diagram Function Module INF F05 S
63
Advertisement
Related Products
Windhager BioWIN 2
Windhager BioWIN 212
Windhager BioWIN 262
Windhager BioWIN series
Windhager BioWIN XL
Windhager BioWIN XL BWE 450 NA
Windhager BioWIN XL BWE 350 NA
Windhager BioWIN XL BWE 600 NA
Windhager BioWIN 152
Windhager BioWIN 332
Windhager Categories
Boiler
Lawn and Garden Equipment
Window Blinds
Pellet stove
Insect Control Equipment
More Windhager Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL