2.
For the installer
2.3.24 Door safety switch
– Route the cable from the door safety switch into the control panel and connect at X15 – Fig. 72.
Fig. 72
Routing the cable from the door
safety switch and connecting at X15
2.3.25 Installing function modules (MES INFINITY control system)
The function modules (MES INFINITY control system) can:
– Be installed on a wall (Fig. 73) or
– Be installed on the control panel in the boiler – Fig. 74.
For installation and connection. see Section 3.2.
Fig. 73
Function modules (MES INFINITY
control system) installed on the wall
2.3.26 Installing the front boiler cover
– Hook in the front boiler cover (Fig. 75) and attach at the rear with 2 self-tapping screws – Fig. 76.
Fig. 75
Hooking in the boiler cover
Fig. 74
Function modules (MES INFINITY
control system) installed on the con-
trol panel in the boiler
Fig. 76
Securing boiler cover in 2 places
32
2 x