Installing The Side Panels And Insulation - Windhager logwin premium touch Installation Instructions Manual

Wood gasification boiler
Hide thumbs Also See for logwin premium touch:
Table of Contents

Advertisement

2.
For the installer

2.3.11 Installing the side panels and insulation

– Screw in 2 M5x10 self-threading TT screws halfway on each side of the base (Fig. 34) and depending on which side
the door catch is to be located. install the lower door hinge for attaching the cladding door on either the left or on
the right with 2 M5x10 self-threading TT screws – Fig. 34.
2 each of
M5x10 TT
Fig. 34
Screwing in 2 screws on each side of the base. installing the cladding door hinge
– Insert insulation on the left and right side of the boiler. as well as on the top – Fig. 35.
Fig. 35
Installing insulation
21
2 x
M5x10 TT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents