YASKAWA SI-P3 Installation Manual page 21

Profibus-dp
Hide thumbs Also See for SI-P3:
Table of Contents

Advertisement

6.
Firmly connect the PROFIBUS-DP communication cable to option communication
connector CN4.
Install PROFIBUS-DP communications cables apart from main-circuit wiring and
other electrical and power lines. Ensure the cable end is firmly connected (see
Figure
18). Refer to
details.
7.
Replace and secure the front covers of the drive (C, F) and replace the digital
operator (D).
NOTICE: Do not pinch cables between the front covers and the drive. Failure to comply could cause
erroneous operation.
Figure 9
8.
Set drive parameters in
parameter F6-30 to a node address unique to the network.
YASKAWA ELECTRIC TOBP C730600 82B YASKAWA AC Drive Option SI-P3 Installation Manual
Communication Cable Specifications on page 30
Figure 9 Replace the Front Covers and Digital Operator
Table 8
5 Installation Procedure
for proper option performance. Be sure to set
for
C
D
F
21

Advertisement

Table of Contents
loading

Table of Contents