Page 3
6.1 Sidecar Integrated Accessory Cabinet-Tie ...................... 71 6.1.1 Circuit Breakers..........................71 6.1.2 Using the UPS when an SIAC-T is Installed....................71 6.2 Sidecar Integrated Accessory Cabinet-Tie Bypass.................... 73 Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 4
9 9 W W a a r r r r a a n n t t y y ............................................................8 8 1 1 Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 5
Eaton 93PM 100 kW SIAC-TB attached to an Eaton 93PM 100 kW UPS............. 4 Figure 4. Eaton 93PM 50 kW UPS with 93PM 50 kW SIAC-T, 93PM 50 kW UPS with 93PM 100 kW SIAC-TB, or 93PM 100 kW UPS with 93PM 100 kW SIAC-T Dimensions (Front View) ..........12 Figure 5.
List of Figures Figure 36. Eaton 93PM 50 kW or 100 kW UPS with Eaton 93PM 50 kW or 100 kW SIAC-T System Online – Two- Breaker (no MIS) .......................... 64 Figure 37. Eaton 93PM 50 kW or 100 kW UPS with Eaton 93PM 50 kW or 100 kW SIAC-T System Online – Three- Breaker (with MIS) ........................
Page 7
Table 2. 100 kW SIAC-T and SIAC-TB Cabinet Weights ..................10 Table 3. External Power Wiring Recommendations for the Eaton 93PM 50 kW SIAC-T and 93PM 100 kW SIAC-T – 1 +1 Parallel Configuration ......................... 22 Table 4. External Power Wiring Recommendations for the Eaton 93PM 50 kW SIAC-T and 93PM 100 kW SIAC-T – 2 +0 Parallel Configuration .........................
Page 8
List of Tables viii Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 9
Right-mounted configuration containing two MOBs with auxiliary contacts and a MIS breaker – Left-mounted configuration containing two MOBs with auxiliary contacts – Left-mounted configuration containing two MOBs with auxiliary contacts and a MIS breaker Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 10
Left-mounted configuration containing two MOBs with auxiliary contacts, a MBP breaker with auxiliary contacts, and a MIS breaker Figure 1. 93PM 50 kW SIAC-T or 93PM 50 kW SIAC-TB attached to an Eaton 93PM 50 kW UPS UPS with Left-Mounted...
Page 11
Introduction Figure 2. 93PM 100 kW SIAC-T attached to an Eaton 93PM 100 kW UPS UPS with Left-Mounted UPS with Right-Mounted Sidecar Sidecar Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 12
Introduction Figure 3. Eaton 93PM 100 kW SIAC-TB attached to an Eaton 93PM 100 kW UPS UPS with Left-Mounted Sidecar UPS with Right-Mounted Sidecar 1 1 . . 4 4 U U s s i i n n g g T T h h i i s s M M a a n n u u a a l l This manual describes how to install the SIAC-T and SIAC-TB and is divided into chapters.
Page 13
F F o o r r M M o o r r e e I I n n f f o o r r m m a a t t i i o o n n Refer to the Eaton 93PM UPS (20–100 kW, 480V 100 kW Frame) Installation and Operation Manual or the Eaton 93PM UPS (20–50 kW, 480V 50 kW Frame) Installation and Operation Manual for the following additional...
Page 14
Introduction Refer to the Eaton 93PM Integrated Accessory Cabinet-Distribution (50 kW, 100 kW, 150 kW, and 200 kW IAC- D) Installation and Operation Manual for the following additional information: • Installation instructions, including site preparation, planning for installation, wiring and safety information, and detailed illustrations of cabinets with dimensional and connection point drawings •...
Page 15
Keep surroundings uncluttered, clean, and free from excess moisture. • Observe all DANGER, CAUTION, and WARNING notices affixed to the inside and outside of the equipment. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 16
Safety Warnings Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 17
Eaton 93PM UPS Installation and Operation manual during installation planning and unpacking. This chapter includes planning for the Eaton 93PM 100 kW Sidecar Integrated Accessory Cabinet-Tie (SIAC-T) or the Eaton 93PM 100 kW Sidecar Integrated Accessory Cabinet-Tie Bypass (SIAC-TB).
Page 18
6 at 85 (188) with MIS Eaton 93PM-100-3 UPS with Left or Right-Mounted SIAC-T 600 (1322) 575 (1267) 6 at 96 (211) Redundant with MIS Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 19
600 (1323) 6 at 100(221) Redundant with MIS and MBP The clearances required around the SIAC-T or SIAC-TB are the same as the attached UPS. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 20
Installation Plan and Unpacking Figure 4. Eaton 93PM 50 kW UPS with 93PM 50 kW SIAC-T, 93PM 50 kW UPS with 93PM 100 kW SIAC- TB, or 93PM 100 kW UPS with 93PM 100 kW SIAC-T Dimensions (Front View) 763 [30.0] 763 [30.0]...
Page 21
Installation Plan and Unpacking Figure 5. Eaton 93PM 50 kW UPS with 93PM 50 kW SIAC-T, 93PM 50 kW UPS with 93PM 100 kW SIAC- TB, or 93PM 100 kW UPS with 93PM 100 kW SIAC-T Dimensions (Top and Bottom Views)
Page 22
Installation Plan and Unpacking Figure 6. Eaton 93PM 50 kW UPS with 93PM 50 kW SIAC-T, 93PM 50 kW UPS with 93PM 100 kW SIAC- TB, or 93PM 100 kW UPS with 93PM 100 kW SIAC-T Center of Gravity Dimensions are in millimeters [inches] NOTE The 93PM UPS is shown with a left-mounted SIAC-T or SIAC-TB.
Page 24
928 (36.5) 476 (18.7) 592 (23.3) 511 (1126) Eaton 93PM-100-3 UPS with SIAC-T 2+0 with MIS Redundant 1007 (39.6) 476 (18.7) 778 (30.6) 575 (1267) Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 25
Installation Plan and Unpacking Figure 7. Eaton 93PM 100 kW UPS with 93PM 100 kW SIAC-TB Dimensions (Front View) Dimensions are in millimeters [inches] Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 26
Installation Plan and Unpacking Figure 8. Eaton 93PM 100 kW UPS with 93PM 100 kW SIAC-TB Dimensions (Top and Bottom Views) View View Front Front Front Front Bottom Bottom View View UPS with Left-Mounted SIAC-TB UPS with Right-Mounted SIAC-TB Dimensions are in millimeters [inches]...
Page 27
Installation Plan and Unpacking Figure 9. Eaton 93PM 100 kW UPS with 93PM 100 kW SIAC-TB Center of Gravity Dimensions are in millimeters [inches] NOTE The 93PM UPS is shown with a left-mounted SIAC-TB. A UPS with a right-mounted SIAC-TB is the mirror image.
Page 28
552 (21.7) 385 (15.2) 536 (1182) and MBP Eaton 93PM-100-3 UPS with SIAC-TB with MIS Redundant 1002 (39.4) 551 (21.7) 374 (14.7) 600 (1323) and MBP Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 29
Floor mounting brackets are optionally available to secure the UPS and SIAC-T or SIAC-TB to the facility floor. Figure 10 shows the mounting hole locations for the brackets. Figure 10. Eaton 93PM UPS Cabinet with SIAC-T or SIAC-TB Front and Rear Floor Mounting Bracket Mounting Dimensions 27 Nm [20 lb-ft.] 27 Nm [20 lb-ft.]...
Page 30
For SIAC-T external power wiring recommendations, including the minimum AWG size of external wiring, see Table 3 Table 4. Wire sizes listed are for copper wiring only. Table 3. External Power Wiring Recommendations for the Eaton 93PM 50 kW SIAC-T and 93PM 100 kW SIAC-T – 1+1 Parallel Configuration Rating 60 Hz Units...
Page 31
Installation Plan and Unpacking Table 3. External Power Wiring Recommendations for the Eaton 93PM 50 kW SIAC-T and 93PM 100 kW SIAC-T – 1+1 Parallel Configuration (Continued) Maximum Amps AC Output to Critical Load with MIS (3- Breaker) Full Load Current...
Page 32
Installation Plan and Unpacking Table 4. External Power Wiring Recommendations for the Eaton 93PM 50 kW SIAC-T and 93PM 100 kW SIAC-T – 2+0 Parallel Configuration (Continued) Minimum Conductor Size (Ground) AWG or kcmil — Number per Phase (each) Maximum Amps...
Page 33
Installation Plan and Unpacking Table 5. External Power Wiring Recommendations for the Eaton 93PM 50 kW SIAC-TB and 93PM 100 kW SIAC-TB – 1+1 Parallel Configuration with Maintenance Bypass (Continued) Number per Phase (each) Minimum Conductor Size (Ground) AWG or kcmil —...
Page 34
Figure 20 Figure 21 shows the location of the SIAC-TB power cable terminals. Table 7. External Input Power Cable Terminations for the Eaton 93PM 50 kW SIAC-T – 1+1 and 2+0 Parallel Configurations Tightening Number and Size of Size Screw and...
Page 35
Installation Plan and Unpacking Table 9. External Input Power Cable Terminations for the Eaton 93PM 100 kW SIAC-T – 1+1 and 2+0 Parallel Configurations Number and Size of Tightening Size Screw and Pressure Termination Torque Nm Termi- Func- Type (AWG or kcmil)
Page 36
Figure 12, or Figure 13) with outer protective packaging material covering the cabinet. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph 1.7 For More Information, for inspection and unpacking instructions. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 37
Figure 11. 93PM 50 kW SIAC-T or 93PM 50 kW SIAC-TB attached to 50 kW UPS as Shipped on Pallet SIAC-T SIAC-T or SIAC-TB or SIAC-TB Left-Mounted Right-Mounted Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 38
Installation Plan and Unpacking Figure 12. Eaton 93PM 100 kW SIAC-T attached to 100 kW UPS as Shipped on Pallet SIAC-T SIAC-T Left-Mounted Right-Mounted Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 39
Installation Plan and Unpacking Figure 13. Eaton 93PM 100 kW SIAC-TB attached to 100 kW UPS as Shipped on Pallet SIAC-TB SIAC-TB Left-Mounted Right-Mounted Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 40
Installation Plan and Unpacking Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 41
The SIAC-T or SIAC-TB is attached to and directly integrated with one of the UPS cabinets at the factory for use in a two UPS parallel system. Refer to the applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph 1.7 For More Information...
Page 42
SIAC-T or SIAC-TB and second UPS inter-cabinet wiring access pass-through (see Figure 14) to the second UPS output terminals. Refer to the applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph 1.7 For More Information, for wiring access information and UPS cabinet terminal locations.
Page 43
10. Reinstall the internal safety shield panel and secure with retained screws. 11. Reinstall the SIAC-T front panel and secure with retained screw. 12. After the SIAC-T is wired, return to the applicable Eaton 93PM UPS installation and operation manual listed in paragraph 1.7 For More Information...
Page 44
Entry Locations Top Entry Conduit Landing (Remove plate to drill or punch conduit holes.) Bottom Entry Conduit Landing (Remove plate to drill or punch conduit holes.) Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 45
(A, B, C) AC Output to Critcal Load (A, B, C) Ground Ground Ground Terminals Terminals Terminals SIAC-T with MIS SIAC-T without MIS Front Front Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 46
Figure 17. 93PM 50 kW SIAC-T and 93PM 100 kW SIAC-T with MIS Output Power Terminal Detail Phase A AC Output to Phase B Critical Load Phase C Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 47
SIAC-TB to the SIAC-TB terminals. See Figure 15 Figure 19 SIAC-TB wiring access information, and Figure 20 Figure 21 for terminal locations. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 48
11. Reinstall the internal safety shield panel and secure with retained screws. 12. Reinstall the SIAC-TB front panel and secure with retained screw. 13. After the SIAC-TB is wired, return to the applicable Eaton 93PM UPS installation and operation manual listed in paragraph 1.7 For More Information...
Page 49
Top Entry Conduit Landing (Remove plate to drill or punch conduit holes.) NOTE: Bottom Entry Conduit Landing (Remove plate to drill or punch conduit holes.) Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 50
Figure 20. 93PM 50 kW SIAC-TB Bypass Input Power, Output Power, and Ground Terminal Locations AC Input to Maintenance Bypass (A, B, C) Maintenance Bypass Breaker AC Output to Critcal Load (A, B, C) Ground Terminals Front Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 51
Figure 21. 93PM 100 kW SIAC-TB Bypass Input Power, Output Power, and Ground Terminal Locations AC Input to Maintenance Bypass (A, B, C) Maintenance Bypass Breaker AC Output to Critcal Load (A, B, C) Ground Terminals Front Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 52
Figure 22. 93PM 50 kW SIAC-TB and 93PM 100 kW SIAC-TB Bypass Input Power Terminal Detail Phase A AC Input to Phase B Maimtenance Bypass Phase C Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 53
Critical Load Phase C Figure 24. 93PM 100 kW SIAC-TB Output Power Terminal Detail Phase A AC Output to Phase B Critical Load Phase C Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 54
Any pair of unused building alarm terminals may be used for the MOB connections. To install wiring: Verify the UPS system is turned off and all power sources are removed. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph 1.7 For More...
Page 55
13. Reinstall the internal safety shield panel and secure with retained screws. 14. Reinstall the SIAC-TB front panel and secure with retained screw. 15. After the SIAC-TB is wired, return to the applicable Eaton 93PM UPS installation and operation manual, listed in paragraph 1.7 For More...
Page 57
NOTE UPS building alarm signals are customer programmable. Customer interface wiring for the SIAC-T MOBs assumes that the UPS Building Alarm is programmed to monitor Normally Closed (NC) contacts. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 60
0.4 (3.5) - 0.8 Slotted Use twisted-pair wires for each input (7.1) and return or common. Strip wire insulation back 10 millimeters to wire terminal blocks. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 61
Output: Normally Closed (NC) contact used to indicate whether MOB 1 is open. Contacts are closed when MOB 2 TB1-6 MOB1 Aux #1 UPS 1 Building Alarm Return is open. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 62
UPS Building Alarm is programmed to monitor Normally Closed (NC) contacts. • “Return“ indicates connection to electronics circuit ground. “Common” indicates connection to common side of isolated relay contact Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 63
NOTE 3 Always confirm contact operation prior to wiring. NOTE 4 Any pair of unused building alarm terminals may be used for the MOB Aux 1 connections. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 65
Chapter 9 Warranty for details. This service is offered as part of the sales contract for the UPS. Contact an Eaton service representative in advance (a minimum two-week notice is required) to reserve a preferred startup date. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 66
Make a copy of the Installation Checklist before filling it out, and retain the original. After the installation is complete, an Eaton Customer Service Engineer must verify the operation of the UPS system and commission it to support the critical load. The service representative cannot perform any installation tasks other than verifying software and operating setup parameters.
Page 71
UPS in the parallel system. The internal structure of each UPS is shown in more detail in the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph 1.7 For More Information. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Onelines and Schematics Figure 36. Eaton 93PM 50 kW or 100 kW UPS with Eaton 93PM 50 kW or 100 kW SIAC-T System Online – Two-Breaker (no MIS) AC Input to UPS 1 AC Input to UPS 2 Bypass 3 Wire...
Onelines and Schematics Figure 37. Eaton 93PM 50 kW or 100 kW UPS with Eaton 93PM 50 kW or 100 kW SIAC-T System Online – Three-Breaker (with MIS) AC Input to UPS 1 AC Input to UPS 2 Bypass 3 Wire...
Onelines and Schematics Figure 38. Eaton 93PM 50 kW or 100 kW UPS with Eaton 93PM 50 kW or 100 kW SIAC-TB System Online AC Input to UPS 1 AC Input to UPS 2 Bypass 3 Wire Bypass 3 Wire...
FROM UPS1 GROUND FROM UPS2 GROUND FROM BUILDING GROUND TO LOAD GROUND LOAD BUS A LOAD BUS B TO LOAD/DISTRIBUTION [1+1] [2+0] LOAD BUS C Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 78
Onelines and Schematics Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 79
CLOSED MOB 2 CLOSED CLOSED Start the UPS. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph 1.7 For More Information, for multiple UPS parallel operating procedures. Reinstall the SIAC-T front panel and secure with retained screw.
MIS (Optional) SIAC-T NOTE The 93PM 100 kW UPS is shown with a left-mounted SIAC-T. A UPS with a right-mounted SIAC-T is the mirror image. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 81
Remove the screw securing the bottom of the SIAC-TB front panel. Lift the panel straight up to remove it from the panel hanger bracket at the top of the cabinet. Retain screw for later use. Transfer the UPS from normal mode to bypass mode. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph 1.7 For More...
Bypass Interlock Plate SIAC-TB NOTE The 93PM 50 kW UPS is shown with a left-mounted SIAC-TB. A UPS with a right-mounted SIAC-TB is the mirror image. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
A UPS with a right-mounted SIAC-TB is the mirror image. CAUTION Failure to close the MBP before opening the MIS will result in the loss of power to the critical load. Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 84
The critical load is supplied by the maintenance bypass source. Open the MOBs. Reinstall the SIAC-TB front panel and secure with retained screw. Shut down the UPS. Refer to the applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph 1.7 For More Information for UPS operating procedures.
Page 85
7 7 . . 2 2 . . 3 3 A A N N N N U U A A L L M M a a i i n n t t e e n n a a n n c c e e Annual preventive maintenance should be performed only by authorized service personnel familiar with maintenance and servicing of the UPS system. Contact an Eaton service representative for more information about service offerings.
Page 86
M M a a i i n n t t e e n n a a n n c c e e T T r r a a i i n n i i n n g g A basic training course, available from Eaton, gives you a competent working knowledge of the UPS system operation and teaches you how to perform first level corrective maintenance.
Page 87
5 to 40°C (41 to 104°F) without derating. The recommended operating temperature is 25°C (77°F) Storage Temperature -25 to +55°C (-13 to +131°F) Operating Altitude Maximum 1500m (5000 ft) at 40°C without derating Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 88
Product Specifications Ventilation Convection 5% to 95% maximum noncondensing Relative Humidity (operating and storage) Not applicable Acoustical Noise Safety Conformance UL1778 5 edition Agency Markings cULus Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04...
Page 89
C C h h a a p p t t e e r r 9 9 W W a a r r r r a a n n t t y y To view the UPS warranty please click on the link or copy the address to download from the Eaton website: UPS Product Warranty https://www.eaton.com/content/dam/eaton/products/backup-power-ups-surge-it-power-distribution/backup-...
Need help?
Do you have a question about the 93PM SIAC-T and is the answer not in the manual?
Questions and answers