Functional Testing; Power Transmission - HBM T10F Mounting Instructions

Torque flanges
Hide thumbs Also See for T10F:
Table of Contents

Advertisement

Settings
52
the installation. The balancing range is a minimum of
"400 mV at nominal (rated) gain. The end point
potentiometer is used for compensation at the factory
and is capped with varnish so that it cannot be turned
unintentionally.
Important
Turning the end point potentiometer changes the factory
calibration of the voltage output.
Fig. 9.3
Setting the voltage output zero point
9.4

Functional testing

9.4.1

Power transmission

If you suspect that the transmission system is not
working properly, you can remove the stator cover and
test for correct functioning. If the LED is on, the rotor and
stator are properly aligned and there is no interference
with the transmission of measurement signals. When the
A0608-14.0 HBM: public
End point
Zero point
T10F

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents