Park Metering Pump Rods - Graco XM 24W626 Operation Manual

Xm pfp plural-component sprayer
Table of Contents

Advertisement

13. Close flush ball valves.
14. Use a rag and solvent to clean spray tip then rein-
stall on gun.
15. Remove the static mixer. Clean the mix element
then re-install the mixer.

Park Metering Pump Rods

NOTE: This procedure is only necessary when the sys-
tem will not be used for more than a few hours. The pri-
mary purpose of this procedure is to prevent material
from hardening on the metering pump shaft by extend-
ing the pump so the portion of the shaft that is exposed
to material is not exposed to the air.
1. Turn the metering pump air regulator (CD) counter-
clockwise to 0 psi.
3A2776H
ti20095a
ti20095a
CD
2. Open fluid recirculation valves.
3. Close mix manifold material ball valves.
4. Open the metering pump air supply ball valve.
5. Press
then press
pumps. Slowly adjust air pressure regulator until
pumps begin to move. Each metering pump will cir-
culate materials until they reach the bottom of the
stroke then will stop.
6. Turn the metering pump air regulator (CD) counter-
clockwise to 0 psi
Park Metering Pump Rods
ti20129a
to start metering
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xm 262869Xm 262945Xm 262943

Table of Contents