Connect The Fluid Hose Bundle To The System - Graco XM 24W626 Operation Manual

Xm pfp plural-component sprayer
Table of Contents

Advertisement

Setup
Connect the Fluid Hose Bundle
to the System
The system is shipped with a 50 ft (15 m) hose bundle
for connecting the system to the mix manifold.
The bundle contains one 3/4 in. ID A material hose, one
1/2 in. ID B material hose (models 262869, 262945) one
3/4 in. ID B material hose (models 24W626, 262943),
one 1/4 in. ID flush hose, and 1/2 in. OD heated fluid cir-
culation tubes. The hose bundle is insulated and
wrapped inside a protective sheath which has a Velcro
closure so it can be opened to change hoses.
For models 262869 and 262945, use 1:1 Hose and Fit-
ting kit 24X461 (supplied with your machine) to replace
the fittings and B side circulation hoses. See supplied
manual 334939 for instructions.
1. Position the hose bundle end with the four loose red
and blue tubes at the machine outlet.
Systems 262869 and 262943: Connect the 3/4 in.
A and 1/2 in. B hoses to the respective material out-
let check valves on the front of the system. See F
19.
Systems 24W626 and 262945: Connect the 3/4 in.
A and 3/4 in. B hoses to the respective material out-
let check valves on the front of the system. See F
19.
F
. 19
IG
24
2. Connect the short purple flush hose from the flush
F
IG
3. Connect the two red tubes in the bundle to the tube
.
IG
.
IG
ti20106a
F
IG
pump to the 1/4 npsm hose in the bundle. Use the
1/4 in. nipple included with the hose bundle to con-
nect the hoses. See F
IG
. 20: Flush Pump Connection
tee on the red tube on the front of the machine. Do
the same for the blue tubes. See F
. 21
. 20.
ti20272a
. 21.
IG
ti20273a
3A2776H

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xm 262869Xm 262945Xm 262943

Table of Contents