Pre-Startup Check; System Environment; Safety Conditions; Chapter 8. Starting The System - Samsung OfficeServ 7400 Installation Manual

Hide thumbs Also See for OfficeServ 7400:
Table of Contents

Advertisement

CHAPTER 8.
This chapter describes the post-installation checks to be made before starting the Office-
Serv 7400 system, the procedure for starting the system, and the procedure for testing the
operation of the system.

8.1 Pre-Startup Check

8.1.1 System Environment

Temperature
Check that the room temperature is between 0°C and 45
ing/cooling device to maintain normal operating temperature.
Humidity
Check that the humidity of the room is between 10% and 90%. Take special precau-
tions since humidity can affect electrical components and connectors.
Direct Sunlight and Dust
The room should be protected from direct sunlight and have a ventilation system to
remove dust and particles.

8.1.2 Safety Conditions

The building where the OfficeServ 7400 system is installed should have lightning rods and
grounding to protect the system against lightning and electrical leakage.
Check that the OfficeServ 7400 system is not on an inclined surface (i.e. is kept hori-
zontal).
Do not place devices that may cause electromagnetic interference near the system.
Place a fire extinguisher near the system. Since sprinklers can seriously damage the
system, use extinguishers such as Halor 1301 and Carbon Dioxide.
Make sure that the input power to the system is within the range AC 100~240 V and
that other electric devices, such as motors and compressors, do not share the same
power socket.
Check that the grounding terminal on the rear panel of the system is properly con-
nected to the external grounding.
© Samsung Business Communications
Starting the System
OfficeServ 7400 Installation Guide
o
C. If it is not, install a heat-
8-1

Advertisement

Table of Contents
loading

Table of Contents