This chapter describes checks to be carried out when inspecting the installation site, and the
grounding and power conditions required for installing the OfficeServ 7400 system. It also
describes the items included in the OfficeServ 7400 package.

1.1 Site Information

Select an installation site that satisfies the following conditions for safety, temperature and
humidity:
Safety Conditions
The system should not be installed near materials that can cause a fire, such as explo-
sive gas and inflammables.
The system should not be near equipment that generates electromagnetic radiation, such as
monitors or copying machines.
The location should be convenient for distributing trunk lines and extension lines, for
connecting power and grounding wires, and for maintenance and repair.
The system should not be installed in aisles or passageways that are populated or used
for moving equipment.
Always maintain cleanliness to prevent dust from damaging the module connections
in the chassis.
Before installing the system, check items such as the electrical wiring status, ground-
ing status, voltage and frequency.
Temperature and Humidity
The conditions for temperature and humidity are as follows:
− Operation Temperature: 0~45°C
− Storage temperature: -10~50°C
− Humidity: 10~90%
− Cool area out of direct sunlight
Ventilators should be installed to remove dust.