Starting; Remove Transportation Safety Devices - Leibinger JET2 neo Manual

Hide thumbs Also See for JET2 neo:
Table of Contents

Advertisement

Group 5
Installation of print head
During an installation of a device in a production line, the operating
staff should be not endangered. Due to moving products under the
print head danger of bruising and shearing can be caused. The
regulations of the machinery directives should be observed!

5.4 Starting

(Commissioning)
For a safe transport some hydraulic components are supplied with transportation
protection (cable ties) and the reservoir tanks are evacuated. The following steps have
to be carried out before the initial operation
Remove the transportation protection (cable ties) (Step 1)
Fill the reservoir tank (Step 2)
Carry out the function <Fill up routine> (Step 3).

5.4.1 Remove transportation safety devices

The pumps of the hydraulic system are secured with cable ties. These have to be
absolutely removed.
Proceeding:
Dismantle the back cover of the hydraulic cabinet (1) by loosing the fixing
screws (2).
Attention!
The cable tie at the main filter (3) should not be removed!
Remove the transportation protection (cable ties).
Now attach the back cover of the hydraulic cabinet again with the according
fixing screws.
JET2 neo
Transport/Start up
(Step 1)
Page 37
Release R1.07 en

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents