Commissioning; Installation And Connection; Procedure - Miele PG 8583 Operating Instructions Manual

Washer-disinfector for laboratory glassware and laboratory utensils
Table of Contents

Advertisement

Commissioning

Switching on
Select
language
Select
temperature unit
26

Installation and connection

Before commissioning the machine must be securely installed, and
the water inlet and drain hoses and the mains cable correctly
connected. See "Installation", "Plumbing connections" and "Electrical
connection" and the installation diagram supplied.

Procedure

During commissioning a set procedure is followed which must not be
interrupted. The display will automatically guide you through the
process.
All settings, except for selecting plumbing connections, can be
retrospectively altered via the
The settings made during the commissioning process are only
adopted after a complete programme has been run.
If the programme is interrupted or if no programme is started and
the machine is switched off, the commissioning process must be
carried out again.
Press the  button until the LED lights up.
The commissioning process starts with selecting the language.
Language 
Use the  and  arrow buttons to select the language you want
and touch OK to save.
The menu for selecting the temperature unit will then appear.
Temperature unit
Use the  and  arrow buttons to select the temperature unit you
want and touch OK to save.
Settings 
english (GB)
(
english (USA)
°C
°F
Further settings
and
menus.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg8583

Table of Contents