Checking Out The System - KVH Industries TracVision G6 Installation & Technical Manual

Hide thumbs Also See for TracVision G6:
Table of Contents

Advertisement

TracVision G6 Technical Manual
Figure 2-39
ADCU DB9 Maintenance Port
A sample startup sequence has
been provided in Appendix E on
page 139 with the typical ranges
and responses for the TracVision
G6 during startup and operation.
56

2.11 Checking Out the System

Now that you've installed the TracVision G6, you need to verify
that the system functions properly. Check the system startup
routine to ensure that the system is operating within normal
parameters.
To view the startup routine, connect a PC to the ADCU's
maintenance port. The diagnostics procedure requires terminal
emulation software such as PROCOMM or Windows Terminal or
Hyperterminal. Use the settings appropriate to your application.
1. Connect one end of the PC data cable to
the DB9 maintenance port connector on the rear of
the ADCU. Connect the other end to the serial port
on the PC (a 9-pin/25-pin connector adapter may
be needed for some PCs).
60 59
58
57
56
55
54
53
52
51
50
49
1
2
3
4
5
6
7
8
9
10
11
12
13 14
2. Open the terminal emulation software and
establish the following settings:
• 9600 baud
• no parity
• 8 data bits
• 1 start bit
• 1 stop bit
• no flow control
3. Apply power to the TracVision G6 system and
allow the system to complete full initialization.
Data should be scrolling on the PC display to
identify any system problems detected. If no data
is seen, recheck your connections and the terminal
software setup.
48 47
46
45
44
43
42
41
40
39
38
37
15
16
17
18
19
20
21
22
23
24
25 26
27
Maintenance
Port (DB9)
28
29
30
31
32
33
34
35
36
54-0161

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents