2.11 Checking Out The System - KVH Industries TracVision G4 Technical Manual

Kvh industries satellitetelevision owner's manual tracvision g4
Hide thumbs Also See for TracVision G4:
Table of Contents

Advertisement

2.11 Checking Out the System

Now that you've installed the TracVision G4, you need to verify
that the system functions properly. Check the system startup
routine to ensure that the system is operating within normal
parameters.
To view the startup routine, connect a PC to the ADCU's
maintenance port. The diagnostics procedure requires Windows
Hyperterminal (or other terminal emulation software, such as
PROCOMM). Use the settings appropriate to your application.
1. Connect one end of the PC data cable to
the DB9 maintenance port connector on the rear of
the ADCU. Connect the other end to the serial port
on the PC (a 9-pin/25-pin connector adapter may
be needed for some PCs).
60 59
58
57
56
55
54
53
52
51
50
49
1
2
3
4
5
6
7
8
9
10
11
12
2. Open the terminal emulation software and
establish the following settings:
• 9600 baud
• no parity
• 8 data bits
• 1 start bit
• 1 stop bit
• no flow control
3. Apply power to the TracVision G4 system and
allow the system to complete full initialization.
Data should be scrolling on the PC display to
identify any system problems detected. If no data
is seen, recheck your connections and the terminal
software setup.
54-0147
48 47
46
45
44
43
42
41
40
39
38
37
13 14
15
16
17
18
19
20
21
22
23
24
25 26
Maintenance
Port (DB9)
27
28
29
30
31
32
33
34
35
36
Figure 2-39
ADCU Maintenance Port
A sample startup sequence has
been provided in Appendix F on
page 143 with the typical ranges
and responses for the
TracVision G4 during startup and
operation.
Installation
55

Advertisement

Table of Contents
loading

Table of Contents