Antenna Gyro Assembly - KVH Industries TracVision G6 Installation & Technical Manual

Hide thumbs Also See for TracVision G6:
Table of Contents

Advertisement

9. Reattach the Molex connectors and the RF cables,
making certain to connect the cables in their
original positions.
Replacing a Fuse
Two 5x20 mm, 3.15-amp, 250-volt fast-blow fuses are mounted to
the Main PCB. If one of these fuses has blown or been broken,
simply remove the bad fuse and replace with a good fuse of the
same rating.
5.5

Antenna Gyro Assembly

1. Remove the PCB cover, as explained in "Removing
the PCB Cover" on page 106.
2. Remove the four screws, four washers, and the
counterweight from the end of the antenna gyro
(see Figure 5-6).
Standoffs
Counterweight
54-0161
Bracket
Gasket
Gyro
Figure 5-6
Replacing the Antenna Gyro
Assembly
Maintenance
109

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents