Table of Contents

Advertisement

10.13. Handle

• Step 1: Separate the barrel from the handle.
• Step 2: Handle base
Unscrew the air nipple using a 6mm allen key.
Replace the seals every 12 months.
• Step 3: Undo both K35 x 14 screws with a 2mm
Phillip's screwdriver. Change the fibre washers
each time the screws are removed.
• Step 4: Lift the base to access the handle base
seal. This seal should be replaced every 12
months.
• Step 5: Push the electrical connector to release
it and remove from the base.
Replace the seal of the connector every 12
months.
• Step 6: Replacement of the base: unscrew
the screw of the ground wire using a 0 Phillip's
screwdriver, withdraw it and replace it.
To reassemble, follow the steps in reverse order. Insert the connector pin back into the base
foolproofing slot.
Coat the air nipple seals with dielectric lubricant.
Tighten the air nipple to 1.5 N.m torque.
Tighten the two K35 x 14 screws to 1.3 N.m torque.
Index revision : C - March 2016
Step 2
Step 3
Step 4
Step 6
41
7105

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gnm 6080 lrNanogun-mv hrGnm 6080 hr

Table of Contents