Installation
5.4 Interconnection
Where separation between the BW500 and BW500/L and belt scale exceeds 150 m (500 ft.), or
legal for trade certification:
1. Remove jumpers from BW500 and BW500/L terminal 11/12 and 13/14
2. Run additional conductors from: BW500 and BW500/L terminal 12 to scale 'red' BW500 and
BW500/L terminal 13 to scale 'blk'
If the load cell wiring colors vary from those shown, or if extra wires are provided, consult
Siemens.
5.4.3
Scale - Two Load Cells
①
②
③
④
30
Customer junction box
Integrator
Load cell excitation
Load cell inputs
BW500 and BW500/L
Operating Instructions, 12/2016, A5E33482052-AD