10. WHAT TO DO TO PREPARE THE MACHI E TO OPERATE

This machine can be installed by:
• the manufacturer;
• a manufacturer representative ;
• the customer.
It is customer duty to get the place ready to install the machine, arranging also the anchor bolts to secure the machine on the
ground.
To installed the machine it is necessary:
• to be sure the place where the machine as to be placed is leveled ;
• prepare the anchor bolts to secure the machine ;
• lift the machine and insert the anchor bolts ;
• Level the machine on the ground working on the leveling screws ;
The machine needs only to be electrically connected.
Before to connect the power :
• check if the operator uses the necessary safety devices ;
• check if the disconnect switch is insulated ;
• check if the control panel is insulated ;
• check if the fuses and circuit breakers are operative ;
• check the 3 phase electric source ;
• if the machine does not work properly, do not try to fix it, but immediately disconnect the power and ask for a mainten-
ance expert ;
• check the correct electrical connection ;
• check if the necessary protection devices work properly;
• check if push buttons and select switch work properly ;
• check the mechanical connections ;
The manufacturer cannot be responsible for injuries and/or damages due to the customer electric source, especial-
ly if it does not meet the present safety requirements. (In Italy DLSG 94/626)
Check if the following motors rotate clockwise :
• hydraulic power unit motor
• coolant pump
• band drive motor
The operator has to make sure:
1. That hydraulic oil and coolant fluid reservoirs are filled until the proper level.
2. The blade is installed (make reference to par. 15.4.)