Assembly And Start-Up; Installing The Device; Unpacking And Checking; Installing The Media Modules - Hirschmann RS20 User Manual

Hide thumbs Also See for RS20:
Table of Contents

Advertisement

2

Assembly and start-up

The devices have been developed for practical application in a harsh indus-
trial environment. The installation process is correspondingly simple.
On delivery, the device is ready for operation.
The following procedure has been proven to be successful for the assembly
of the device:

Unpacking and checking

Installing the media modules

Installing the SFP modules
Signal contact
Installing the device and grounding
Supply voltage
Startup
Installing the data lines
2.1

Installing the device

2.1.1
Unpacking and checking
Check whether the contents of the package are complete
„Scope of
delivery").
Check the individual parts for transport damage.
2.1.2
Installing the media modules
On delivery, the device is ready for operation.
The modules can be used in
MACH 102-8TP basic device
MACH 102-8TP-R basic device
See the ESD guidelines on page
The media modules are hot-plug-compatible, which means that you can re-
place the modules with a module of the same kind during operation.
Note: If you are replacing media, e.g. removing a TX media module and plug-
ging in an FX media module in its place, the MACH 100 performs a warm
start.
20
8
and the safety instructions on page 7ff.
(see page 38
MACH 100
Release
07/09

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents