Assembly And Start-Up; Installing The Device; Unpacking And Checking; Installing The Sfp Modules (If Present) - Hirschmann RS20 Series User Manual

Industrial ethernet rail switch
Hide thumbs Also See for RS20 Series:
Table of Contents

Advertisement

2

Assembly and start-up

The devices have been developed for practical application in a harsh indus-
trial environment. The installation process is correspondingly simple.
On delivery, the device is ready for operation.
The following steps should be performed to install and configure a switch:

Unpacking and checking

Installing the SFP modules
Insert data in label area
Adjust DIP switch settings
Connect PoE power unit (optional)
Connect the terminal block for voltage supply and signal
contact and connect the supply voltage
Install the basic module on the DIN rail, grounding
Install the terminal block, start-up procedure
Installing the data lines
2.1

Installing the device

2.1.1
Unpacking and checking
Check whether the contents of the package are complete
„Scope of
delivery").
Check the individual parts for transport damage.
2.1.2

Installing the SFP modules (if present)

1
Figure 13: 1 - Fast EHTERNET fiber optic SFP module
2 - Gigabit ETHERNET fiber optic SFP module
To attach an SFP module, first remove the protective cap over the socket.
Push the SFP module with the lock closed into the socket until it latches
audibly in place.
Note: Only use Hirschmann SFP modules
RS20/RS22/RS30/RS32/RS40
Release 12 07/09
2
(see page 55 „Scope of
(see page 55
delivery").
29

Advertisement

Table of Contents
loading

Table of Contents