Functions And Licenses - Mitsubishi Electric AE-200A Service Handbook

Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

[IV Product specifications and functions]

2. Functions and licenses

Function
Web browser
Personal browser
Error mail notification
management (TG-2000A)
Integrated
Yearly/weekly schedule
TG-2000A Electric energy charge (electric
energy manual entry method)
TG-2000A Electric energy charge (electric
energy metering-device method)
TG-2000A Meter charge (electric energy
metering-device method)
AE-200 Electric energy charge (electric energy
manual entry method)
AE-200 Electric energy charge (electric energy
metering-device method)
AE-200 Meter charge (electric energy
metering-device method)
Operation
DIDO controller method
and
Free contact method
monitoring
PLC method
of general
equipment
Interlocked
DIDO controller method
control of
Free contact method
general
PLC method (between PLC
equipment
equipment)
PLC method (between
air-conditioning units and PLC
equipment)
Night mode
External temperature interlock control
Night setback function
Set temperature range limit setting
Temperature and humidity measurement
Upper and lower limit warning mail
Energy management function
Peak cut control (other system method)
Peak cut control (electric energy amount
monitoring method)
Peak cut control
(Peak cut level contact input)
Peak cut control (PLC method)
Outdoor unit operation status monitoring
Super user
Maintenance tool
● Registration of the license is required for each AE-200/AE-50/EW-50.
● The above functions are subject to change without notice for improvement.
Supplementary explanation
Method that does not use an electricity meter. TG-2000A is required.
Method to charge for electric energy used by air conditioner.
TG-2000A is required.
Function to charge for outlet and other general electric power, gas,
water, etc. TG-2000A is required.
Method that does not use an electricity meter.
Method to charge for electric energy used by air conditioner.
Function to charge for outlet and other general electric power, gas,
water, etc.
TG-2000A is required.
TG-2000A is required.
When using interlocked control of the AE-200/AE-50/EW-50
When using interlocked control of the AE-200/AE-50/EW-50
TG-2000A is required.
TG-2000A is required.
A PI controller is required.
Method to directly input the peak cut level from the demand controller
to the external input of the AE-200/AE-50/EW-50.
Demand Input PLC Software is required.
43
Legend ○: License required
Licenses

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-200eAe-50eEw-50eEw-50aAe-50a

Table of Contents