Setting Check List - Mitsubishi Electric AE-200A Service Handbook

Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

[VII Test run check lists for initial work and expansion work]

[1] Setting check list

Configure the settings for the functions you wish to operate and then perform the following checks.
For the setting procedures, refer to "Instruction Book" for the unit or "Instruction Book (Web Browser for Initial Settings)."
User settings
Date and time settings
Network settings
Group settings
Initial settings
Interlock LOSSNAY settings
Block settings
Advanced settings
Floor plan creation
Monitor display
settings
Floor layout settings
Schedule settings (yearly/weekly/today)
External temperature interlock control settings
Night setback function settings screen
System changeover settings
PI controller and AI controller settings
Function
Measurement settings
settings
Mail settings
Energy management settings
Set temperature range limit
Night mode schedule settings
General control PLC settings
Peak cut settings
Interlock control settings
Refrigerant system settings
Energy management block settings
Indoor unit settings
Outdoor unit settings
Measurement settings
Charge settings
Metering device connected/not connected
Options
Calculation of standby electric energy charge
*1
Currency unit
Billing
Display order of charge calculation result
settings
Merger of energy management blocks with
same name
Decimal point character and separator character
settings for CSV file
Unit price settings
Print settings
CSV output settings
Closing data calculation
Charge calculation IP address setting
*1
Registration of the license is required for each AE-200/AE-50/EW-50.
For the required licenses, refer to "IV [4] 2. Functions and licenses."
Setting items
Web
Unit
browser
89
○: Settable
Initial
Charge
Setting
Calculation
Check
Tool
Tool

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-200eAe-50eEw-50eEw-50aAe-50a

Table of Contents