Operation For Completion And Others - Hitachi 902 Service Manual

Automatic analyzer
Table of Contents

Advertisement

12.10 Operation for Completion and Others

(1)
Turn off the power switch, and remove the right cover and circuit board stopper from the
inside of the front door of the main unit. Pull out the EMOT200 board and turn off DIP SW
1, no. 6. Return the board to its original condition and turn on the power switch.
(2)
Output and analyze accumulated alarm information in Alarm Log Print. Delete alarm
information.
(3)
Delete the contents of request on the Calibration Registration screen.
(4)
Delete all data for routine samples on the Monitor screen.
(5)
Make final check of the instrument (attachment of covers, tightening of screws, etc.).
(6)
Turn off the power switch of the instrument and the deionized water supply unit. Also turn
off the tap water.
(7)
Write the date of takeover on the date label and attach it to the 902 main unit (side for
example).
12 - 11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents