Connecting Data and Management Cables
Pin
7
8
Related Information
"Front Panel Components (Installation)" on page 12
■
"Rear Panel Components (Installation)" on page 13
■
"Cabling Requirements" on page 41
■
Connecting Data and Management Cables
After you have connected these cables, see
Time" on page 53
"Connect the SER MGT Cable" on page 48
■
"Connect the NET MGT Cable" on page 49
■
"Connect Ethernet Network Cables" on page 50
■
"Connect Other Data Cables" on page 51
■
Related Information
"Front Panel Components (Installation)" on page 12
■
"Rear Panel Components (Installation)" on page 13
■
"Cabling Requirements" on page 41
■
"Identifying Ports" on page 42
■
Connect the SER MGT Cable
The SP serial management port is labeled SER MGT. Use the SP SER MGT port only for server
management. This port is the default connection between the SP and a terminal or a computer.
Caution -
Connect an RJ-45 cable (Category 5 or better) from the SER MGT to a terminal
device.
48
SPARC T7-2 Server Installation Guide • March 2016
Signal Description
Green Ground
Blue Ground
before connecting the AC power cords.
Do not attach a modem to this port.
Pin
Signal Description
15
VGA 12C Serial Clock
"Powering On the Server for the First