Introduction

This appendix lists the tasks for installing a SmartNode 4830 Series Analog VoIP IAD (see
copy of this checklist and mark the entries as you complete each task. For each SmartNode 4830 Series IAD,
include a copy of the completed checklist in your site log.
Network information available & recorded in site log
Environmental specifications verified
Installation site pre-power check completed
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Initial configuration performed
Introduction
Table 22. Installation checklist
Task
Site power voltages verified
Required tools available
Cable length limits verified
Initial operation verified
F • Installation checklist
table
Verified by
Date
22). Make a