SmartNode 4830 Getting Started Guide
Installation checklist
The installation checklist (see
copy of this checklist and mark the entries as you complete each task. For each SmartNode 4830 Series VoIP
IAD, include a copy of the completed checklist in your site log.
Network information available & recorded in site log
Environmental specifications verified
Installation site pre-power check completed
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Initial configuration performed
Planning the installation
table
3) lists the tasks for installing a SmartNode 4830 Series VoIP IAD. Make a
Table 3. Installation checklist
Task
Site power voltages verified
Required tools available
Cable length limits verified
Initial operation verified
3 • Hardware installation
Verified by
Date