Throttle Cable Removal And Installation; Throttle Cable Inspection; Throttle Cable Play Inspection And Adjustment - Suzuki ltz 400 Service Manual

Hide thumbs Also See for ltz 400:
Table of Contents

Advertisement

1D-5 Engine Mechanical:
4) Disconnect the IAT sensor coupler (4).
5) Remove the air cleaner box (5) by removing the air
cleaner box mounting bolts.
Installation
Install the air cleaner box in the reverse order of
removal. Pay attention to the following points:
Tighten the air cleaner box mounting bolts to the
specified torque.
Tightening torque
Air cleaner box mounting bolt (a): 10 N·m (1.0 kgf-
m, 7.0 lb-ft)
(a)
4
5
I933H1140010-01
I933H1140011-01
(a)
I933H1140012-01

Throttle Cable Removal and Installation

Removal
1) Remove the fuel tank and fuel tank lower cover.
Refer to "Fuel Tank Removal and Installation in
Section 1G (Page 1G-9)".
2) Remove the throttle cable as shown in the cable
routing diagram. Refer to "Hose and Cable Routing
Diagram in Section 4A (Page 4A-3)".
Installation
Install the throttle cable in the reverse order of removal.
Pay attention to the following points:
• Install the throttle cable as shown in the cable routing
diagram. Refer to "Hose and Cable Routing Diagram
in Section 4A (Page 4A-3)".
• Check the throttle cable play and proper operation.
Refer to "Throttle Cable Play Inspection and
Adjustment in Section 0B (Page 0B-10)".

Throttle Cable Inspection

Check that the throttle lever move smoothly from full
open to full close. If it does not move smoothly, lubricate
the throttle cable.

Throttle Cable Play Inspection and Adjustment

Refer to "Throttle Cable Play Inspection and Adjustment
in Section 0B (Page 0B-10)".
B933H21406005
B933H21406006
B933H21406007

Advertisement

Table of Contents
loading

Table of Contents