Step 4, Reporting And Monitoring Installation Data - SolarEdge Power Harvesting System Installation Manual

For three phase inverters
Table of Contents

Advertisement

SolarEdge Installation Guide for Three Phase Inverters – EU – Version 1.5
NOTE:
It can take up to 15 minutes for all power optimizers to transmit their telemetries
and to be counted on the LCD screen.
5 Verify that the Vac [v] on the LCD panel specifies the grid's correct
AC output voltage in Volts.
6 Verify that the Vdc [v] on the LCD panel specifies the DC input
voltage in Volts, which should be between 250 V and 450 V.
7 Verify that Pac [w] on the LCD Panel specifies the total AC output
power produced, in Watts.
NOTE:
Take note of the serial # on the inverter's sticker and on its warranty card. This
information is used in the SolarEdge Monitoring Portal to identify this inverter
and is needed to open a new site in the monitoring portal.
Congratulations! Your SolarEdge power harvesting system is
now operational.
Step 4, Reporting and Monitoring
Installation Data
The SolarEdge Monitoring Portal enables you to access SolarEdge site
information, as described in the SolarEdge Monitoring Portal User Guide,
as well as receive up-to-date information from the installation site for
viewing in a physical or logical view.
After a site is opened in the SolarEdge Monitoring Server, you can access
all the monitored data about that site.
To register a new site, fill in the online form at
http:/www.solaredge.com/groups/site-registration.
The serial number(s) of the inverter(s) must be specified in order to open a
new site.
Commissioning the Installation