Installation
Connection to the front of the machine
NOTE: When connecting sinks and conveyors, no holes must be drilled on the
front of the machine.
If the machine is to be corner-loaded, there must be at least 300 mm of free space
in front of the machine to allow the electrical cabinet and the door of the storage
cabinet for detergent and drying agent (option) to be opened.
The legs on the sink connected to the front of the machine must be at least 300
mm away from the machine to allow the machine to be accessed for servicing.
1.
Water connection
2.
Electrical connection
3.
Floor drain
4.
Legs
Attach the sink connection to the machine and then adjust.
Seal with silicone between the connection and the machine.
Secure the sink to the wall with wall brackets.
Use a spirit level to check that the sinks are horizontal and adjust the height, if
necessary.
WD-6C
2
4
11
Rev. 3.0 (201305)
1
3
300730_C_R2c