Hydraulic System - New Holland TS-100A Assembly & Instruction Manual

Cab 2 wd / 4 wd
Table of Contents

Advertisement

MAVERICK PRE-DELIVERY INSPECTION CHECKLIST
Pre-Operation Inspection:
that they are properly assembled. (See following page 1-4 for component location)
Saftey Equipment:
-----
Operators Manual is with Unit.
-----
The Safety Decals are installed as listed in the Assembly Manual.
-----
Valve operation plate is installed.
-----
Operators cage or Tractor Cab is in place.
-----
Deflectors are installed on the Mower Head.
-----
Tractor Rops or Cab with seatbels installed properly.
Frame and Boom: (NH TS-100A, 115A, 125A & 135A)
-----
Axle Plate Bolts are torqued to 280 ft. lbs.
-----
Boom Rest Axle Plate Bolts are torqued to 280 ft. lbs.
-----
Front Rail Bolts are torqued to 425 ft. lbs.
-----
Front Support Bolts at tractor are torqued to 355 ft. lbs.
-----
Rear Rail Bolts torque to 425 ft lbs.
-----
Rotator bolts torque to 120 ft. lbs.
-----
All Welds inspected toinsure proper welds and locations.

Hydraulic System:

-----
Oil Level in Hydraulic Tank is within the sight gauge.
-----
Hose connections are tight.
-----
Hoses do not have any kinks or twist in them.
-----
Front Pump Shaft adapter bolts are tight..
-----
Front Pump Shaft Coupler / Drive Shaft is lubricated and has an anti-seize compound
on the Splines of Pump and Shafts.
-----
The Pump Drive Shaft has correct alignment.
-----
Suction Hose has no leaks or kinks.
Rotary Mower Head:
-----
Skid Shoe Bolts are torqued to 120 ft. lbs.
-----
Spindle Housing Bolts are torqued to 400 ft. lbs.
-----
The Spindle Housing is properly lubricated.
-----
Motor Bolts are torqued to 120 ft. lbs.
-----
Blade Carrier (Bar) Bolts torque to 400 ft. lbs.
-----
Blade Bolts are torqued and the retainings Pins are in place.
-----
Blades Swing freely.
Boom:
-----
Boom Telesoping Bearings Adjusted completely inward.
-----
All Hoses tightened and no leaks.
-----
All hoses secured to where they will not rub, get pinched or hanging down where they may
catch on something.
-----
All Decals installed
-----
Pump Primed and Pressure adjusted if needed (only applys to Pump for Cylinder control.
Maverick (NH TS-100A, 115A, 125A, 135A, Asy. Manl) 01/05
© 2005 Alamo Group Inc.
Check the following items before operating the unit to assure
Section 12 - 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ts-115aTs-135aTs-125aTs110

Table of Contents