Test Procedures; General - Mitel SX-200 Manual

Ip communications platform
Hide thumbs Also See for SX-200:
Table of Contents

Advertisement

6. TEST PROCEDURES

General

If all LEDs turn on steady for more than a few seconds there is an error.
Check wiring, then try a known good spare.
Perform these test procedures as operational tests when in-
6.01
stalling a SUPERSEJ 3 telephone after initial installation of a
system.
6.02
Whenever a SUPERSET 3 telephone is connected to an 'operat-
ing system, or the system has just been powered up, the test is
run automatically and the following results appear. If any test fails,
verify that the system is installed correctly and is powered up.
TEST
LED1
1
on
2
flashing
3
o f f
or
on
If the system is programmed to detect a missing
6.03
telephone, perform the following to verify this feature:
Disconnect the SUPERSEJ 3 modular plug.
Verify that the appropriate alarm has been raised.
Reconnect the modular cord to the
Clear the alarm.
3 TELEPHONE, POWER-ON TEST
LED2
LED3
I
on
on
off
Off
off
o f f
Off
Off
SUPERSEJ 3
3 Telephone Description
TIMING
1 second
IO-15
seconds
steady, if set is
on-hook
steady, if set is
off-hook
SUPERSEJ 3
telephone.
Page 13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents