Test Operation
1.2.2 Turn Power On
Turn outdoor unit and indoor
unit power on.
Check the LED display of the
outdoor unit PC board.
Make field settings with outdoor
unit PC board.
Conduct check operations.
Check for normal operation.
66
Be sure to turn the power on 6 hours before starting operation to protect
compressors. (to power on clankcase heater)
Check to be sure the transmission is normal.
The transmission is normal if the LEDs display conditions as shown in
table below.
Micro-
computer
Ready
Mode
operation
/Error
monitor
HAP
H1P
H2P
l
h
h
Make field settings if needed.
(For the setting procedure, refer to information in "3.2. Field Setting
from Outdoor Unit" on page 96 onward.)
For the outdoor-multi system, make field settings with the master unit.
(Field settings made with the slave unit will be all invalid.)
The check operations shown below will be automatically initiated.
• Check for erroneous wirings
• Check for failure to open stop valves
• Check for excessive refrigerant refilling
• Automatic judgment of piping length
Before starting the normal operation after the completion of check
operations, make sure indoor and outdoor units normally operate.
LED display k ON h OFF l Blinking
Cooling/Heating
changeover
Low
noise
Indivi-
Bulk
Bulk
dual
(master)
(slave)
H3P
H4P
H5P
H6P
k
h
h
h
SiBE28-805
Demand Multi
H7P
H8P
h
h
Test Operation