®
KUDO
MULTI-MODE WST
Rigging Procedures
VERSION 1.0
3. On each KUDO
®
enclosure, place the dolly board by attaching both captive BLP.
4. Lift / rotate the stack.
!
A minimum of 3 people are required to lift a stack of 3 KUDO
A minimum of 5 people are required to lift a stack of 4 or more KUDO
Take care to avoid mechanical shock when landing the stack.
WARNING
5. Take down the KBUMP and arrange the enclosures for transportation, as it is shown in steps 6 through 8 in section
6.1.3 (pay attention to the warning sign).
KUDO_RM_ML_1.0
®
SYSTEM
Figure 33: Installing the dolly boards
Figure 34: Lifting/rotating the stack
w w w . l - a c o u s t i c s . c o m
®
enclosures.
®
enclosures.
24 en
Need help?
Do you have a question about the kudo multi-mode wst and is the answer not in the manual?