4.
Secure KUDO
®
#2 to KUDO
5.
Repeat steps 2 through 4 for all KUDO
6.
Arrange / stack the dolly boards.
6.1.3
Taking down the array
1. Remove both lower front BLP from the next to bottom KUDO
Figure 17: Detaching the next to bottom enclosure's front rigging points
KUDO_RM_ML_1.0
®
#1 by attaching both BLP to both front rigging points.
Figure 16: Securing KUDO
®
enclosures.
w w w . l - a c o u s t i c s . c o m
®
®
#2 to KUDO
#1
®
enclosure.
EN
15 en
Need help?
Do you have a question about the kudo multi-mode wst and is the answer not in the manual?